Rigging system, KB Hallen
KB Hallen is a rebuild music and theater venue, and needed a system for rigging lights and sound for concerts and events.
Client:Venuepoint Live A/S
Engineer:Rambøll A/SSteel Construction:Levi Jensen
CONTACT:Levi JensenConstruction EngineerM: +45 20 37 22 11
E: Levi@levijensen.dk
Medlem af:
Levi Jensen ApSGrønlandsvej 154681 HerfølgeDenmark